Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordfence domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/tqnet/domains/tqnet-consulting.com/public_html/wp-includes/functions.php on line 6170
April 2025 – TQ Net Consulting
Skip to content
+387 33 463 638 +381 11 832 56 10 office@tqnet-consulting.com
TQ Net Consulting
  • Početna
  • O nama
  • Usluge
    • Optimizacija i poslovni procesi
    • Trening i obuka
      • KATALOG OBUKA
    • Zelena agenda
    • Međunarodni standardi
      • ISO 9001
      • ISO 14001
      • ISO 45001
      • ISO 27001
      • ISO 17020
      • ISO 17025
      • ISO 3834
      • EN 1090
      • FSSC 22000
      • GLOBAL G.A.P
      • HACCP
      • IFS
      • BRC
  • Blog
  • Kontakt
Menu Close
  • Početna
  • O nama
  • Usluge
    • Optimizacija i poslovni procesi
    • Trening i obuka
      • KATALOG OBUKA
    • Zelena agenda
    • Međunarodni standardi
      • ISO 9001
      • ISO 14001
      • ISO 45001
      • ISO 27001
      • ISO 17020
      • ISO 17025
      • ISO 3834
      • EN 1090
      • FSSC 22000
      • GLOBAL G.A.P
      • HACCP
      • IFS
      • BRC
  • Blog
  • Kontakt

Monthly Archives: April 2025

  1. Home>
  2. 2025>
  3. April
Read more about the article Lean plan za proizvođače

Lean plan za proizvođače

  • Post author:Mara Bokić Savić - Senior konsultant, Lead auditor
  • Post published:08-04-2025
  • Post category:Blog

Lean metode su set principa i tehnika usmerenih na eliminaciju rasipanja (gubitaka) i kontinuiranog poboljšanja poslovnih procesa. Ove metode potiču iz Toyota proizvodnog sistema i danas se primenjuju u različitim…

April 2025
M T W T F S S
 123456
78910111213
14151617181920
21222324252627
282930  
« Mar   May »

  • Kako izgleda realan plan proizvodnje u metalnoj industriji?
  • Zašto plan proizvodnje postoji ali se ne realizuje?
  • Zašto održavanje nije trošak nego preduslov realizacije plana
  • Kako proizvodnja gubi zbog neplaniranih zastoja opreme
  • Kašnjenja u isporuci nisu logistički nego procesni problem

Kontakt

  • Kancelarije:Sarajevo, Beograd
  • Fiksni (BiH, Srb):+387 33 463 638; +381 11 832 56 10
  • Mobilni (BiH, Srb):+387 65 662 348; +381 64 528 16 46
  • Email:office@tqnet-consulting.comOpens in your application


  • OPTIMIZACIJA I UPRAVLJANJE POSLOVNIM PROCESIMA BPM (BIZNIS PROCES MANAGEMENT)
  • TRENING I OBUKA
  • ZELENA AGENDA
  • MEĐUNARODNI STANDARDI
  • KONTAKT
Prijavi se i dobijaj obavještenja sa našeg sajta.
Loading
© Copyright - TQ NET CONSULTING